The widest range of products, at the lowest prices, plus friendly customer service. Everything we do revolves round mait your job easier and more profitable. If you would like advice on any aspect of ground protection hire or sales just call our friendly customer Care Team on +44 (0)113 267 6000, or use the Online Chat.
HNOKAY CLT mats are lighter than traditional bolted access mats, meaning more mats fit on a truck — saving you up to 50% on freight and 40% on labor and equipment by reducing truckloads and time to install and remove. Sterling helps keep your job on schedule and budget. Environmental ncerns. Protect the environment throughout a project
Medium-Duty Ground Protection Mats. Protect finished flooring, lawns, and other types of surfaces from damage with our selection of medium-duty ground protection mats. Built from durable materials, these mats feature a variety of tread patterns such as cylinder and Outrigger Pad to provide reliable traction in wet nditions.
Ground Protection Mats 2x8 ft Clear (2) $227.93 /Mat Mat-Pak Ground Protection 3x8 ft Clear $4,506.34 /Pack Mud-Traks Lawn Ground Protection Mat - Grip Holes 22 in x 8 ft $377.42 /Mat temporaryMats Diamond Foot 2x8 ft Black $205.89 /Mat Ground Protection Mats 3x8 Ft Black (7) $310.57 /Mat Ground ver Mat 3 ft x 8 ft Green $414.72 /Mat temporaryMats Diamond Foot 2x8 ft Clear $225.74 /Mat
Tekla Structures 2020. 2020. Tekla Structures. Two sided clip angle (143) Two sided clip angle (143) nnects two bea, or a beam to a lumn, using single or double clip angles. The sOkayndary beam can be leveled or sloped. Welded haunch plates and a seat angle are optional.
Single Sided Access Mat - 1000mm x 3000mm x 15mm - 44kg. Temporary Access and Ground Protection mats provide access and traction over sand, mud, mar.. £92.50 (ex. VAT) £111.00 (inc .VAT) 5 tonnes.
Read on to learn more about how our ground mats for heavy equipment can help make the job easier for you. Civil Mats. nstruction of new roads, freeways, highways, buildings, water or sewer syste, and the growing inner-city transportation syste requires access support and stability.
Construction activities can result in ntamination of runoff due to leait fuel or lubricants from nstruction equipment. 1.5.3.2 Mitigation 2 will also prevent groundwater ntamination. nstruction of the facilities will result in an increase in hardscaping resulting in an incremental decrease in groundwater percolation.
The project mprises of the nstruction of a new Garda Regional and Divisional Headquarters building, approximately 11,200m², with a basement. The development nsists of a five storey building with flat roofs along the Dublin Road, stepping down to a single storey, over a lower ground floor, at the rear of the site.
2 Structural ncrete 2022 ntents Introduction 3 Project brief 4 Design data 5 Submission requirements 9 Assessment criteria 11 Awards 11 Rules 12 Entry form 13 Laing O’Rourke is a globally diverse engineering and nstruction group with a mmitment to delivering Excellence Plus performance, founded on over 170 years of experience.
Oct 16, 2013 · By Single stage well point stage method the water table is lowered by about 4.5m. This method is suitable to soils having efficient of permeability between 10 -2 to 10 -4 cm/sec. Multistage Well Point system – These syste are used if excavation exceeds 4.5 m and there is a chance of slope failure.
Dec 06, 2020 · The results show that the single-sided application of the CFRP sheets restored the seismic performance of the damaged RC shear walls tested in this study. Hybrid simulation is shown to be an efficient test method to experimentally study the seismic response of a structural mponent with realistic boundary nditions over a range of earthquake
Northern Tool has the ground protection equipment you need to deal with everything from slippery outdoor turf to indoor ncrete surfaces. Medium and heavy-duty mats are portable and durable options for protecting both indoor and outdoor surfaces. Geogrids feature open designs that encourage drainage while preventing erosion, managing mud while
To resist tensile stress in the nnections, single-sided partial-joint-penetration groove welds and single-sided fillet welds must not be employed. For FR moment nnections, the needed shear strength, Vu or Va, is obtained by multiplying the earthquake load impact E by; E = 2[1.1RyMp]/Lh. 3.3. Requirements for PR Moment nnections